NEWRecognition module — recognise hard work and the people going above and beyond

FleetOptix

Maintenance & inspection

What is a preventative maintenance inspection?

A preventative maintenance inspection, or PMI, is a scheduled safety inspection of a vehicle carried out to a set list at a set frequency, independently of whether anything is known to be wrong with it.

preventative maintenance inspection — diagram A preventative maintenance inspection, or PMI, is a scheduled safety inspection of a vehicle carried out to a set list at a set frequency, independently of whether anything is known to be wrong with it. Daily check By the driver, beforefirst use, recorded… Defect report Written, and closed outwith what was… Safety inspection To your own declaredinterval, which you… Annual test One day's snapshot of aregime that runs all year
Preventative maintenance inspection, shown in the maintenance regime.
Use this diagram+

Free to use on your own site, in training material or in a handout, as long as the credit link stays on it. Paste this where you want the diagram to appear.

<figure>
  <img src="https://fleetoptix.co.uk/glossary/preventative-maintenance-inspection/diagram.svg" alt="preventative maintenance inspection — diagram from FleetOptix" width="880" height="620" loading="lazy">
  <figcaption>
    <a href="https://fleetoptix.co.uk/glossary/preventative-maintenance-inspection">What is a preventative maintenance inspection?</a> — diagram by
    <a href="https://fleetoptix.co.uk">FleetOptix</a>
  </figcaption>
</figure>

It is the backbone of an operator's maintenance system and the thing an examiner asks to see first. The inspection is planned in advance, carried out to a recognised list, recorded, and any defect it finds is followed through to rectification and sign-off.

The frequency is set by the operator based on how the vehicles are used — mileage, load, terrain and age all bear on it — and then declared. Having chosen an interval, the operator is measured against their own, so a schedule that is routinely missed is worse than a longer one that is kept.

The record is the deliverable. A sheet showing every item inspected, the defects found, the work done and a signature attesting roadworthiness is what turns a workshop visit into evidence of a system.

What goes wrong in practice

  • Inspections drifting past their declared interval, which shows up immediately when dates are laid against the planner.
  • Sheets signed off with defects still open and nothing recording their repair.
  • A planner kept for the next few weeks only, so nobody can show the pattern over a year.
  • Brake performance never assessed in any meaningful way across the inspection cycle.